Stapleton East Bridge Town Center Update

East Bridge Town Center Progress 

"Good Things Come To Those Who Wait"

Being an Eastbridge resident myself, I can fully attest to the frustration of waiting 10 years for our Town Center. Now, this Fall, we are finally getting one and it is going to be incredible!

Construction on the Eastbridge Town Center is in full swing after the sale of the land closed in November of last year.  The area is going to be built-out in two separate spaces, restaurants and retail on the West end around a public plaza, and a new King Soopers on the East end of MLK and Havana. This layout is different than the East 29th Avenue Town Center, which was built around the public right of way of 29th Ave. The King Soopers grocery store will be modeled after their store near Leetsdale and Colorado Boulevard.  Total acreage is 6.75 acres, with 58,000 square feet planned for the King Soopers and 20,000 to 22,000 square feet for the shops.  The shops portion is just under half of what the E. 29th Avenue Town Center has.  There will also be a fire pit on the West end, with the restaurants surrounding it, and the East end will have a water feature much to the delight of all the Stapleton neighborhood children.

There will be a public gathering place and fire pit on the West end with restaurants surrounding it. The East end will have a new water feature much to the delight of children throughout the neighborhood.

A characteristic that most Stapletonians enjoy is the walkability and bike-ability of our neighborhood. Let's face it, that's a big reason many of us live here. I am so excited that the Eastbridge Town Center will welcome and accommodate both. The Eastbridge Town Center is going to offer a wonderful place for Stapleton residents to gather at unique places, mingle with friends, and enjoy the amazing weather Denver offers the majority of the year.

I am so excited that the East Bridge Town Center is going to feature restaurants from acclaimed restaurateur and Stapleton resident Troy Guard. Troy Guard, of Guard and Grace, Tag, Bubu and Sugarmill, will have two restaurants located in the new Eastbridge Town Center. Los Chingones will open the second location which includes a roof top patio. Troy will also be opening a breakfast spot, think grilled lamb neck Benedict, Moroccan chicken hash and a farmer's market frittata!  Additional restaurants will include a coffee shop (there will also be a Starbucks in the King Soopers), an Asian focused restaurant and a lunchtime soup and sandwich place.

The great minds behind the Eastbridge Town Center are Evergreen Development and City Street Investors, who are best known for leasing and managing the amazing restaurants and shops on Larimer Square.  The overall architectural design is being handled by Scott Higa of G3 Architecture. City Street Investors had a vision on wanting to build a Town Center concept similar to their project in Lowry, called Hangar 2.  When they identified that the best site for it was the Eastbridge Town Center, they contacted Evergreen, and things went into motion from there.

City Street Investors had a vision of building a Town Center concept similar to their project in Lowry, called Hangar 2.  They identified Eastbridge as the perfect site, contacted Evergreen Development and things went into motion from there.

Stapletonians have been waiting a long time for this new town center and it's finally becoming a reality. So, let the countdown truly begin. Completion is scheduled for late Fall, 2016!   

 Additionally, I am so excited that the East Bridge Town Center is going to feature restaurants from Stapleton resident Troy Guard. 

East Bridge Town Center Progress

East Bridge Town Center Progress

Stapleton Homes for Sale

38 Properties
Page 1 of 4
$1,279,560
Subdivision: Stapleton North End
5
Beds
2F23/411/2
Baths
4,344
Sq.Ft.
2019
Year Built
10
Days on Site
1686545
MLS
Soaring, light-filled space lends a dramatic impact upon entering this spectacular LUXE 2. A main floor bedroom suite offers flexibility, quiet privacy and multi-generational needs. And seamless...
Open 1/18
8596 E 51st Ave Denver, CO 80238
$1,220,000
Subdivision: Stapleton
6
Beds
4F13/4
Baths
5,375
Sq.Ft.
2013
Year Built
75
Days on Site
2259961
MLS
*OPEN HOUSE this Saturday 1/18 from 2-4pm!*This home radiates luxury, quality and craftsmanship with an East coast exterior and refreshed interior*Come see the incredible transformation of this...
$1,100,000
Subdivision: Stapleton
5
Beds
4F11/2
Baths
4,669
Sq.Ft.
2013
Year Built
4
Days on Site
7775942
MLS
This GORGEOUS rare Parkwood home, filled with high end finishes for your executive lifestyle. This home boasts an amazing open floor plan, gourmet kitchen, granite countertops, butler pantry,...
$1,089,570
Subdivision: Stapleton
4
Beds
3F13/411/2
Baths
4,139
Sq.Ft.
2005
Year Built
9
Days on Site
9722980
MLS
THIS IS AN ENTERTAINERS DREAM*PERFECT LOCATION ACROSS FROM THE PARK*TONS OF NATURAL LIGHT THROUGHOUT*SUPERB ARCHITECTURAL DETAILS...ALDER CABINETS, CROWN MOLDING, HARD WOOD FLOORS, DUAL SIDED...
$979,900
Subdivision: Stapleton
5
Beds
4F11/2
Baths
4,808
Sq.Ft.
2007
Year Built
2
Days on Site
3359943
MLS
CLASSIC AND TIMELESS INFINTY BUILT SEMI-CUSTOM HOME*CENTRALLY LOCATED IN ONE OF STAPLETON'S MOST DESIRABLE LOCATIONS OF CENTRAL PARK* WITHIN 1 MILE TO LIGHT RAIL, PARKS & WONDERFUL RESTAURANTS + ONLY...
Open 1/18
9391 E 59th North Place Denver, CO 80238
$899,000
Subdivision: Stapleton
4
Beds
3F13/411/2
Baths
3,275
Sq.Ft.
2017
Year Built
3
Days on Site
3339748
MLS
Stunning 3 story home with lavish finishes and upgrades throughout! Nestled on a premium corner lot in the sought-after Northern Stapleton neighborhood, just a short walk to the community park, pool,...
Open 1/18
9166 E 35th Ave Denver, CO 80238
$825,000
Subdivision: Stapleton filing 19
4
Beds
1F23/411/2
Baths
3,276
Sq.Ft.
2010
Year Built
6
Days on Site
9919123
MLS
Popular Balboa Model By Infinity Homes in Central Park North on the Greenbelt! This home is spectacular. Shows like a model with numerous upgrades AND updates! Top of the line open-concept kitchen...
$815,000
Subdivision: Stapleton
4
Beds
2F21/2
Baths
3,275
Sq.Ft.
2017
Year Built
10
Days on Site
5044674
MLS
Enhance your lifestyle through breathtaking architecture, uncanny views, & unique neo designs found in this amazing 3-story home, boasting 4 bedrooms + loft, 4 bathrooms, penthouse level...
$769,900
Subdivision: Stapleton
4
Beds
3F11/2
Baths
2,951
Sq.Ft.
2014
Year Built
3
Days on Site
3854890
MLS
Stunningly appointed home in desirable Stapleton across from open space. A dramatic 2-floor entry welcomes you into the spacious open concept floor plan that is accented by lovely engineered hardwood...
$731,900
Subdivision: STAPLETON
4
Beds
4F11/2
Baths
3,790
Sq.Ft.
2015
Year Built
16
Days on Site
5959200
MLS
Welcome to your dream home! This lovely 4 bedroom, 4 1/2 bath townhouse is sure to catch your eye! This charming row house provides lots of living space for the whole family, featuring a welcoming...
$725,000
Subdivision: Stapleton
4
Beds
3F11/2
Baths
3,078
Sq.Ft.
2015
Year Built
10
Days on Site
5171806
MLS
This Thrive Zero Energy 4 bed, 3.5 bath home was constructed with 9" thick exterior walls, has owned solar panels, dual tankless water heaters and reverse heat pump air-conditioning for unmatched...
$709,900
Subdivision: Beeler Park
4
Beds
1F23/411/2
Baths
3,262
Sq.Ft.
2019
Year Built
41
Days on Site
6821173
MLS
Open concept floor plan that features 10' ceilings, study, and dining room on the main level. A corner fireplace warms up the great room and makes this home perfect for entertaining. The gourmet...
The content relating to real estate for sale in this web site comes in part from the Internet Data eXchange ("IDX") program of METROLIST INC® Real estate listings held by brokers other than Kentwood City Properties are marked with the IDX Logo. This information is being provided for the consumers' personal, non-commercial use and may not be used for any other purpose. All information subject to change and should be independently verified. Click here for the full Terms of Use.

Post a Comment